Project ITTO
DEVELOPING SUPPLY CAPACITY OF WOOD-BASED BIOMASS ENERGY THROUGH IMPROVED ENABLING CONDITIONS AND EFFICIENT UTILIZATIONOF DEGRADED FOREST LANDS INVOLVING LOCAL COMMUNITIES IN NORTH SUMATRA PROVINCE OF INDONESIA
Indonesia is currently striving to increase its supply of renewable green energy and targeting to install 810 MW of renewable power generating capacity by year 2025 part of which is expected to be generated by the forest sector. This proposed project aims to increase the contribution of the forest sector to renewable energy supply and regional economic development through increased supply of woodbased biomass energy. Its specific objective is to improve enabling conditions for building up supply capacity of wood-based biomass energy in North Sumatra region by efficiently utilizing existing forest resources through development of energy forests on degraded lands involving local communities. etc.

Activity 1.1:
To identify available suitable lands for development of energy forests in North Sumatra province Utilization of renewable energy is a necessity to overcome the dependence on fossil energy. To support contribution of forestry sector in sustainable energy development, it is necessary to strengthen the enabling conditions, such as raw materials availability through the development of energy forests.... etc.

Peraturan
Undang-Undang No. 5/1960
Undang-Undang Nomor 5 Tahun 1960 Tentang Peraturan Dasar Pokok-Pokok Agraria
Peraturan Pemerintah No. 58/2007
Peraturan Pemerintah Republik Indonesia Nomor 58 Tahun 2007 Tentang Perubahan ...
KMK Tarif PPN 11 Persen
Pers Realese Penyesuaian Tarif PPN 11% Mulai 1 April 2022Sehubungan dengan ...
PerDirJen BUK-KLHK No. P.2/2015
Peraturan Dirjen Bina Usaha Kehutanan No. P.2/VI-SET/2015 Tentang Metode Pengukuran ...
Edaran
Libur Kantor ISWA dalam Rangka Idul Fitri 1444 H
Hari libur Kantor ISWA selama perayaan Hari Raya Idul Fitri ...
Libur Kantor ISWA dalam Rangka Nataru 2023
VERIFIKASI TEKNIS EKSPOR PRODUK INDUSTRI KEHUTANAN
TIM PRESIDIUM ISWA
SK DPP ISWA Nomor: 006/2-ISWA/SKP/VI/2022 Tentang Pengangkatan Struktur dan Tugas Presidium ...
Statistik Pengunjung
Hari ini | : | 8 |
Kemarin | : | 30 |
Bulan ini | : | 724 |
Tahun ini | : | 7.131 |
Total | : | 43.180 |
IP Anda | : | 3.237.31.191 |